_ Greece – North Greece
All the licenses for Solar Park 9 MB (the land is leased).
In total 9 MW plants are expected to produce 12.566.000 kWh/year.
All the necessary permits have secured, as well as Power Purchase Agreements (PPA)
with HTSO with a feed in Tariff of 172 Euros/MWh
The only pending issue is signing the grid connection works agreements with PPC and private contractor.
Code(Ger)
Greece – West Greece
West Greece, 2MW solar park license, with expected solar radiation of 3.150.000KWH/YEAR,
The production license is taken
the taken tariff is 172 Euros/MWh
Field orientation : south
field is 40.635,00 sq.m.
The land is leased for 300 euros for each 1.000 sq. m. per year
The license is for sale
Code(gg84-86-pat)
Greece Central Greece
Ready to build 500 KW Solar park License for sale
Tariff 172 Euros/MWh
the land of 15500 sq.m. is leased per 300 Euros per 1.000 sq. m.
Code(gg15-16-liv)
Greece West Greece
Ready to build 5MW Solar park License for sale.
The license belongs to S.A. company
Tariff 172 Euros/MWh
the land of 120.000 sq.m. is leased per 30.000 Euros per year.
Code(vikt-360-38-ait-lkr)
Greece West Greece
Ready to build 2MW Solar park License for sale.
The license belongs to S.A. company
Tariff 172 Euros/MWh
the land of 39.500 sq.m. is leased per 240 Euros per 1.000 sq. m. per year.
Code(vikt-30-34-ait-lkr)
All the licenses for Solar Park 9 MB (the land is leased).
In total 9 MW plants are expected to produce 12.566.000 kWh/year.
All the necessary permits have secured, as well as Power Purchase Agreements (PPA)
with HTSO with a feed in Tariff of 172 Euros/MWh
The only pending issue is signing the grid connection works agreements with PPC and private contractor.
Code(Ger)
Greece – West Greece
West Greece, 2MW solar park license, with expected solar radiation of 3.150.000KWH/YEAR,
The production license is taken
the taken tariff is 172 Euros/MWh
Field orientation : south
field is 40.635,00 sq.m.
The land is leased for 300 euros for each 1.000 sq. m. per year
The license is for sale
Code(gg84-86-pat)
Greece Central Greece
Ready to build 500 KW Solar park License for sale
Tariff 172 Euros/MWh
the land of 15500 sq.m. is leased per 300 Euros per 1.000 sq. m.
Code(gg15-16-liv)
Greece West Greece
Ready to build 5MW Solar park License for sale.
The license belongs to S.A. company
Tariff 172 Euros/MWh
the land of 120.000 sq.m. is leased per 30.000 Euros per year.
Code(vikt-360-38-ait-lkr)
Greece West Greece
Ready to build 2MW Solar park License for sale.
The license belongs to S.A. company
Tariff 172 Euros/MWh
the land of 39.500 sq.m. is leased per 240 Euros per 1.000 sq. m. per year.
Code(vikt-30-34-ait-lkr)
Licenses for solar park creation of 3 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 6 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 9 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 12 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 3 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 3 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 6 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 9 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 12 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 6 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 9 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 12 MW
Athens – Attica area
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 3 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 3 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 6 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 9 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
Licenses for solar park creation of 12 MW
Central Greece
Tariff 172 Euros/MWh
for more information's please contact at [email protected]
Code(al-euth)
_ Licenses of 11 x 500, for solar park creation for sale or co development
Central Greece
11 Χ 500 KW
Tariff 172 Euros/MWh
Connection to the grid cost is approximately 21.000 - 23.000 per 500KW
for more information's please contact at [email protected]
Code(retz90)
Licenses for solar park creation of 1 MW
Athens – Attica area
1 MW (total 1 MW)
Tariff 172 Euros/MWh
Cost per MW 340.000 Euros
Connection cost 35000 euros
Code(agio-xouv)
Central Greece
11 Χ 500 KW
Tariff 172 Euros/MWh
Connection to the grid cost is approximately 21.000 - 23.000 per 500KW
for more information's please contact at [email protected]
Code(retz90)
Licenses for solar park creation of 1 MW
Athens – Attica area
1 MW (total 1 MW)
Tariff 172 Euros/MWh
Cost per MW 340.000 Euros
Connection cost 35000 euros
Code(agio-xouv)
___Greece – North Greece, solar park license for 1,8 MW
_
Solar licenses for 1,8 MW solar park creation.
The license is mature and the project is ready to begin immediately.
The field is 54.000 sq.m. The tariff is 172 Euros/MWh
mr Gialidis [email protected]
(code VAS-ANT-900)
Greece – West Greece, solar park license for 1,8 MW
Solar licenses for 1,7 MW solar park creation.
The license is mature and the project is ready to begin immediately.
The field is 40.000 sq.m. The tariff is 172 Euros/MWh
mr Gialidis [email protected]
(code VAS-ANT-1050)
Solar licenses for 1,8 MW solar park creation.
The license is mature and the project is ready to begin immediately.
The field is 54.000 sq.m. The tariff is 172 Euros/MWh
mr Gialidis [email protected]
(code VAS-ANT-900)
Greece – West Greece, solar park license for 1,8 MW
Solar licenses for 1,7 MW solar park creation.
The license is mature and the project is ready to begin immediately.
The field is 40.000 sq.m. The tariff is 172 Euros/MWh
mr Gialidis [email protected]
(code VAS-ANT-1050)
Greece – Central Greece
Solar licenses for 6 MW solar park creation
Greece – Central Greece - Solar licenses for solar park creation
All the licenses for Solar Park 6 MW
The price per KBW is 172 Euros/MWh
mr Gialidis [email protected]
(code kosded)
Greece – Central Greece
Solar licenses for 2MW solar park creation
Greece – Central Greece - Solar licenses for solar park creation
All the licenses for Solar Park 2 MW
The price per KW is 172 Euros/MWh
mr Gialidis [email protected]
(code kosded)
Greece – Central Greece
Solar licenses for 5 MW solar park creation
All the licenses for Solar Park 5 MW
The price per MW is 172 Euros/MWh
mr Gialidis [email protected]
(code agio?)
Greece – Central Greece
All the licenses for Solar Park 12 MW (the land is leased), with all permits taken and paid until the last of 2012.
Also will be paid the connection to the National Electricity Company and the cost of manufacturing electricity substation (which is required and constructed by the National Electricity Company for big solar farms).
Annual production is 1.800.000 KWH per 1 MW
The price per KWH is 172 Euros/MWh
(code thpap)
Extra optional services offered
Construction management 2,5 % of the budget
Operation management 2,6% of the annual turnover. (maintenance, spare parts and materials not included )
Broker Commission 5 % of the real selling price
(TP)
Greece
All the licenses for Solar Park 6 MW (the land is leased), with all permits taken and paid until the last of 2012.
Also will be paid the connection to the National Electricity Company and the cost of manufacturing electricity substation (which is required and constructed by the National Electricity Company for big solar farms).
Extra optional services offered
construction of the project
Construction management
Operation management
Broker Commission 5 % of the real selling price
(GS)
Wind park
Already operating wind park of 42 MW (21 MW and 21 MW) in Greece Peloponisos area.
The total production is 77.000.000 KWH
The annual operating expenses are 1,5 million Euros
Broker and intermediates Commission 6 % of the real selling price
Price 59 million Euros, maybe reducing to 50 million Euros
(TP)
License for Wind park
License for wind park of 42 MW (21 MW and 21 MW) in Greece.
The total production is 87.000.000 KW
The price per KWH is 0,0875 plus 20% or 0,0875 plus 18 million grand
The annual operating expenses are 1,7 million Euros
The annual turnover is about 9.135.000 Euros including maintenance and spare parts
Broker commission 5 % of the real selling price
Price for all the licenses and the construction 58 million Euros (also the selling of majority percentage until 85% of the project is examined
(TP)
Greece – North Greece
All the licenses that has been taken and the creation of a Solar Park 400 KW (the land is leased per 240 Euros per year for each 1.000 sq. m.).
Annual turnover 220.000 Euros
Annual profits 195.000 Euros
Broker Commission 5 % of the real selling price
Price 1.340.000 Euros
(TP)
Greece – Central Greece
All the licenses for Solar Park 1 MW, in an area of 40.000 sq. r. (purchased with the land), with all permits already taken and paid. Also is paid the connection to the National Electricity Company and the cost of manufacturing electricity substation (which is required and constructed by the National Electricity Company for big solar farms).
Broker and intermediates Commission 6 % of the real selling price
(pr600)
Solar licenses for 6 MW solar park creation
Greece – Central Greece - Solar licenses for solar park creation
All the licenses for Solar Park 6 MW
The price per KBW is 172 Euros/MWh
mr Gialidis [email protected]
(code kosded)
Greece – Central Greece
Solar licenses for 2MW solar park creation
Greece – Central Greece - Solar licenses for solar park creation
All the licenses for Solar Park 2 MW
The price per KW is 172 Euros/MWh
mr Gialidis [email protected]
(code kosded)
Greece – Central Greece
Solar licenses for 5 MW solar park creation
All the licenses for Solar Park 5 MW
The price per MW is 172 Euros/MWh
mr Gialidis [email protected]
(code agio?)
Greece – Central Greece
All the licenses for Solar Park 12 MW (the land is leased), with all permits taken and paid until the last of 2012.
Also will be paid the connection to the National Electricity Company and the cost of manufacturing electricity substation (which is required and constructed by the National Electricity Company for big solar farms).
Annual production is 1.800.000 KWH per 1 MW
The price per KWH is 172 Euros/MWh
(code thpap)
Extra optional services offered
Construction management 2,5 % of the budget
Operation management 2,6% of the annual turnover. (maintenance, spare parts and materials not included )
Broker Commission 5 % of the real selling price
(TP)
Greece
All the licenses for Solar Park 6 MW (the land is leased), with all permits taken and paid until the last of 2012.
Also will be paid the connection to the National Electricity Company and the cost of manufacturing electricity substation (which is required and constructed by the National Electricity Company for big solar farms).
Extra optional services offered
construction of the project
Construction management
Operation management
Broker Commission 5 % of the real selling price
(GS)
Wind park
Already operating wind park of 42 MW (21 MW and 21 MW) in Greece Peloponisos area.
The total production is 77.000.000 KWH
The annual operating expenses are 1,5 million Euros
Broker and intermediates Commission 6 % of the real selling price
Price 59 million Euros, maybe reducing to 50 million Euros
(TP)
License for Wind park
License for wind park of 42 MW (21 MW and 21 MW) in Greece.
The total production is 87.000.000 KW
The price per KWH is 0,0875 plus 20% or 0,0875 plus 18 million grand
The annual operating expenses are 1,7 million Euros
The annual turnover is about 9.135.000 Euros including maintenance and spare parts
Broker commission 5 % of the real selling price
Price for all the licenses and the construction 58 million Euros (also the selling of majority percentage until 85% of the project is examined
(TP)
Greece – North Greece
All the licenses that has been taken and the creation of a Solar Park 400 KW (the land is leased per 240 Euros per year for each 1.000 sq. m.).
Annual turnover 220.000 Euros
Annual profits 195.000 Euros
Broker Commission 5 % of the real selling price
Price 1.340.000 Euros
(TP)
Greece – Central Greece
All the licenses for Solar Park 1 MW, in an area of 40.000 sq. r. (purchased with the land), with all permits already taken and paid. Also is paid the connection to the National Electricity Company and the cost of manufacturing electricity substation (which is required and constructed by the National Electricity Company for big solar farms).
Broker and intermediates Commission 6 % of the real selling price
(pr600)
we are members of the http://luxury-properties-worldwide.com